Timber Frame Dwelling Upgrade, Wicklow – Completed Images, External

Click here to read more about this project…Completed 01a_450

 

Timber Frame Dwelling Upgrade, Wicklow – Completed Images, Internal

Completed 02_920

 

Timber Frame Dwelling Upgrade, Wicklow – Week 15

Week 15:Week 15_450

The carpets have been laid in all of the room at first floor as the contract works near completion.  The house is now ready for the client to move back in!

Click here to read more about this project.

 

Timber Frame Dwelling Upgrade, Wicklow – Week 14 (cont.)

Week 14 (cont.):Week 14a_450

The Solar Hot Water system has been commissioned.  The solar panels have been located on the optimum south facing roof surface to the rear so as to achieve maximum efficiency.

Click here to read more about this project.

 

Timber Frame Dwelling Upgrade, Wicklow – Week 14

Week 14:Week 14_450

The internal doors and ironmongery have been fitted.  All bathrooms have been tiled and all sanitary ware has been second fixed.

With the flooring down and the walls painted, the new bright spacious double height entrance space is nearing completion with light from the south flooding in to this space for the first time.

Click here to read more about this project.

 

Timber Frame Dwelling Upgrade, Wicklow – Week 13

Week 13:Week 13_450

All of the internal walls and ceilings have now been painted and the electrical and mechanical second fix is almost complete.

This timber flooring has been laid internally and the hardwood ‘balau’ decking boards are also currently being fitted.  The seamless transition from the open plan internal space to the external rear deck area starts to emerge bringing the views of the surrounding landscape deep into the heart of the space.

Click here to read more about this project.

 

Timber Frame Dwelling Upgrade, Wicklow – Week 12

Week 12:Week 12_450

The new kitchen units have been fitted meaning that the new appliances can be fitted and all associated work can now be completed.  The new walnut timber flooring will be laid throughout the entire ground floor at the end of this week.

Click here to read more about this project.

 

Timber Frame Dwelling Upgrade, Wicklow – Week 11

Week 11:Week 11_450

The remainder of the walls and ceilings have been slabbed and the skim coat of plaster is now almost complete throughout the house.  This will be given sufficient drying time before painting and a number of other second fix items can be complete.

Click here to read more about this project.

Timber Frame Dwelling Upgrade, Wicklow – Week 10

Week 10:Week 10_450

The stair structure has been constructed in situ.  The plywood carcass will be finished with walnut treads and white painted risers.  The concept behind the design of the stairs is to create a staircase that is subtly carved out of this corner of the entrance space so as to emphasise that in moving from ground to first floor, you are moving from the more open living spaces to the more private quiet spaces at 1st floor.

Click here to read more about this project.

 

Timber Frame Dwelling Upgrade, Wicklow – Week 9

Week 9:Week 09_450

This week saw the installation of the mechanical heat recovery ventilation system. Installing this system will mean that the rate of air change within the dwelling will be fully controlled at all time.  The principal of the heat recovery’ ventilation system is quite simple.  The system brings fresh filtered air into the dwelling and evenly distributes it throughout the rooms of the house whilst at the same time extracting the not-so-fresh air.  However, prior to the not-so-fresh air being extracted, the system takes the heat from this air and uses it to heat the fresh filtered air coming into the dwelling, thus maintaining a constant heat within the house and reducing heat loss dramatically.

To read more about these systems go to:

www.vent-axia.com

Internally the plaster slabs are being installed.  Once this is complete, the electrical and mechanical second fix and the finishes generally can begin.

Click here to read more about this project.